O-Score proof
KYUK reports that Bethel Search and Rescue's first aerial survey of Kuskokwim River freeze-up on Nov. 18 found a lot of open water as warm weather has left conditions unsafe for travel. This item is SINGLE-SOURCE: KYUK is the only source cited.
10O-Score10 · Fully overlooked0 of 13 major U.S. outlets identified in a search-based check (about 6:57-6:59 p.m. ET, Nov. 22, 2026). · See proof →Method note: Score reflects coverage as of publish date; changed Nov 2, 2026. Only articles dated on or before our publish date (Nov 22, 2026, ET) count. Later articles are listed as pickups and never lower the score.
Status history (2 events, ET)
- O-Score recheck: 10 (Fully overlooked) · of 13 outlets counted
- Published
The math
- Outlets checked: 13 major U.S. national outlets.
- Confirmed reports of this story dated on or before our publish date: 0.
- 0 found → O-Score 10 (Fully overlooked). Higher means more overlooked.
| Score | Meaning | Major U.S. outlets that covered it |
|---|---|---|
| 10 | Fully overlooked ← this story | 0 of 13 outlets |
| 8 | Barely covered | 1 outlet |
| 6, 5 | Lightly covered | 2 outlets (6) · 3 outlets (5) |
| 4, 3 | Covered | 4 outlets (4) · 5 outlets (3) |
| 2, 1, 0 | Widely covered | 6–7 outlets (2) · 8–10 outlets (1) · 11–13 outlets (0) |
Provisional: Search-based provisional check about 6:57-6:59 p.m. ET, Nov. 22, 2026: all 13 outlets (AP, Reuters, NYT, WaPo, WSJ, CNN, Fox, NBC, CBS, ABC, NPR, USA Today, Bloomberg) were checked by topic query and site-batch queries. No matching coverage of this item was identified. Related coverage listed in oscore_related_not_counted was not counted.
Checked Nov 22, 2026, 6:59 PM ET
Every outlet
| Outlet | Result | Searches run |
|---|---|---|
| AP | Not found | [object Object] [object Object] [object Object] |
| Reuters | Not found | [object Object] [object Object] [object Object] |
| NYT | Not found | [object Object] [object Object] [object Object] |
| WaPo | Not found | [object Object] [object Object] [object Object] |
| WSJ | Not found | [object Object] [object Object] [object Object] |
| CNN | Not found | [object Object] [object Object] [object Object] |
| Fox | Not found | [object Object] [object Object] [object Object] |
| NBC | Not found | [object Object] [object Object] [object Object] |
| CBS | Not found | [object Object] [object Object] [object Object] |
| ABC | Not found | [object Object] [object Object] [object Object] |
| NPR | Not found | [object Object] [object Object] [object Object] |
| USA Today | Not found | [object Object] [object Object] [object Object] |
| Bloomberg | Not found | [object Object] [object Object] [object Object] |
Pickups
We published: Nov 22, 2026 (ET).
No major-outlet pickup after our publish date yet.
Check history
| Checked (ET) | Check | O-Score | Confirmed outlets | What changed |
|---|---|---|---|---|
| Nov 22, 2026, 6:59 PM ET | search-based provisional | 10 Fully overlooked | 0 | No change |
Search terms
Method
A match counts only if the outlet’s own article is about this story, not a passing mention. “Not found” means not found by these methods; search engines index only part of each site. Stories are rechecked daily for pickups; the score itself is locked to coverage as of our publish date.